All values are indicative. Engineering verification is required before procurement or construction.
Interactive configuration studio

Explore your AI infrastructure.

Adjust IT demand and rack density to explore preliminary power and cooling requirements.

ALICE Digital Twin

Target IT capacity

ALICE™ PMDCSTUDIO / ENGINEERING CONCEPT
40 FT HIGH CUBE
ALICE™ PMDC · 3D STUDIO
Generated 3D studio model — illustrative, not a factory photograph or an approved layout.ReturnExternal power, CDU and heat rejection are project-specific.
Quantity illustration — not a floor plan
No verified physical layout.
POWERCDUHEAT REJECTION
Rack positions
IT load
Liquid cooling
Residual air

Preliminary simulation, not live telemetry. Rack positions do not establish physical fit. Cooling loads exclude auxiliary heat and design margins.

Engineering checks

Estimated facility power uses calculator PUE. Heat rejection check is a lower bound, not equipment selection. CDU ratings must be verified at design conditions. Geometry excludes wall services and requires OEM validation.

Engineering tools

Power & Cooling Sizing Calculator.

Estimate the site electrical budget and thermal loads before detailed design.

Estimated facility demand
Non-IT electrical budget
Liquid cooling design load
Residual air design load
Water flow estimate
Annual energy at full load
IT heat subtotal with margin—

Water flow uses 4.186 kJ/kg·K and approximate density 1,000 kg/m³. Glycol properties, pump head, approach temperatures, auxiliary heat, climate and redundancy require separate engineering. PUE is an assumption, not a guaranteed value. Annual energy assumes continuous full load.

PUE is an energy ratio; the power estimate assumes the same ratio at steady load. Non-IT electrical losses must be allocated to their actual heat paths before cooler selection. A design margin is not N+1 redundancy.

ALICE IMMERSION · ENGINEERING

Immersion configuration studio

Explore preliminary single-phase tank sizing and facility requirements.

Required tank positions—
Facility electrical demand—
IT heat rejection design load—
Facility water flow estimate—
Non-IT electrical budget—

Preliminary sizing only. Tank capacity and PUE are assumptions, not ALICE product ratings. Assumes all IT heat is transferred to the facility water loop. Water flow excludes glycol corrections, auxiliary heat and pump sizing. Physical fit, fluid compatibility, tank mass and redundancy require separate validation.